Construction/Maintenance
o Installation of electrical, telephone, and cable TV conduit was completed along Pepperbush Lane and Parkside Drive.
o W.G. Lapsley and Associates, in conjunction with Fallon Utilities, have verified water utility installation placement in compliance with state requirements along South Shore Drive and Parkside Drive.
o Water booster stations and wells have been inspected. Unofficially, the utilities installed meet requirements for depth and required separations from other utilities.